Part 1 · Draw the flowsheet
1Plan the flowsheet
Before opening the editor, write down what you are going to draw. For this case study we model a typical copper-gold concentrator treating 500 t/h of ore:
| Tag | Unit | Role |
|---|---|---|
| — | ROM ore | Plant feed, 500 t/h at 0.80 % Cu and 0.30 g/t Au |
| CR-101 | Jaw crusher | Primary crushing |
| ML-201 | Ball mill | Grinding, closed with cyclones |
| CY-201 | Hydrocyclones | Classification: underflow back to the mill, overflow to flotation |
| FL-301 | Rougher flotation | Rougher concentrate to the cleaners, tailings to the dam |
| FL-302 | Cleaner flotation | Final concentrate; cleaner tailings recycled to the rougher |
| TH-401 | Thickener | Concentrate dewatering |
| FP-402 | Filter press | Filter cake = final Cu-Au concentrate |
Add the process water additions (mill, cleaners) and the water leaving the plant (thickener overflow, filtrate). Water streams matter: without them the water balance cannot close.
2Create a new diagram
Sign in, open My diagrams and click + New Diagram. The editor opens with an empty canvas: the symbol library on the left, the toolbar on top and the properties panel on the right. Click the title in the top bar and rename the diagram to Cu-Au concentrator.

3Place the equipment
In the library choose the 3D style and the General area. Drag the Jaw Crusher, Ball Mill, Hydrocyclone, Flotation Cell (twice), Thickener and Filter Press onto the canvas. Use the search box (“thick…”) when you know the name. For the feed use the Ore pile, and the Tailings pond for the dam.

Double-click a symbol to edit its label. For the concentrate use a Pill shape from Shapes, and plain Box shapes for water sources and sinks (process water, thickener overflow, filtrate). Colour them light blue in the properties panel so water is easy to recognise.
4Arrange the layout
Lay out the plant in two rows: comminution on the top row from left to right, flotation and dewatering on the bottom row from right to left. This “snake” layout keeps the diagram compact and the streams short.
Turn on Snap in the bottom toolbar so units snap to the grid, and use the alignment buttons that appear when several units are selected to line up their centres. Leave about two symbol widths between units — the stream labels need the space once the balance is on.

5Connect the streams
Choose Connect in the toolbar. Every unit shows four connection points (north, east, south, west). Click the outlet port of one unit, then click the next unit near its inlet port: ROM ore → jaw crusher → ball mill → hydrocyclones, and so on. Go back to Select when you are done.

Every arrow is a stream. Its direction matters: the balance treats arrows into a unit as feed and arrows out of it as products.
6Draw the recycle streams
A concentrator has recycles, and the balance finds them automatically. Draw them like any other stream, but choose the ports so the line does not cross the units:
- Cyclone underflow (S4): from the south port of the cyclones to the south port of the ball mill.
- Cleaner tailings (S9): from the south port of the cleaners back to the south port of the rougher.
Select the arrow and set From Port and To Port in the properties panel. The Smooth Angle style routes the line around the units with rounded corners.


7Add equipment tags
Click a unit and fill in Tag under Process data (CR-101, ML-201, CY-201…). Tags appear under the label in orange and are used everywhere in the balance: stream table, unit results and the Excel export.

8Number the streams and mark the water
Click each arrow and give it a Stream no. (1, 2, 3…). Numbers make the labels short (S1, S2…) and the tables readable. We use 1–11 for slurry and 20–24 for water.
Water streams need one more click: under Balance choose the stream type Water. Water carries no solids and no metal, so the balance treats it differently from slurry. Leave the flow empty — PfdLabs calculates it from the water balance.

Part 2 · Enter the data
9Collect the plant data
A mass balance needs measurements. In a real plant they come from the weightometer, density gauges and a sampling survey (composite samples over a shift, assayed in the lab). This is what we enter:
| Stream | From → To | Solids t/h | % solids | Cu % | Au g/t |
|---|---|---|---|---|---|
| S1 | ROM ore → Jaw crusher | 500 | 97 | 0.80 | 0.30 |
| S4 | Cyclone underflow → Ball mill | 1 250 | 75 | 0.82 | 0.31 |
| S5 | Cyclone overflow → Rougher | 35 | |||
| S6 | Rougher conc. → Cleaner | 50.7 | 25 | 8.0 | 2.8 |
| S7 | Rougher tails → Tailings dam | 0.08 | |||
| S8 | Cleaner conc. → Thickener | 13.9 | 30 | 26.0 | 9.0 |
| S9 | Cleaner tails → Rougher | 20 | 1.2 | ||
| S10 | Thickener underflow → Filter | 65 | |||
| S11 | Filter cake → Concentrate | 91 |
Empty cells are not measured: PfdLabs will calculate them. Notice what is not needed — no tonnage on the crusher discharge, the cyclone feed, the tailings or the filter cake, and no water flows at all.
10Add the components
Open the Mass balance panel (button in the top bar) and add the components you assay: type Cu, choose %, click + Component; then Au in g/t. Every slurry stream now has a Cu and an Au field.

11Enter the feed
Click stream S1 and enter 500 t/h, 97 % solids, 0.80 % Cu and 0.30 g/t Au. The stream label on the diagram updates immediately and the Calculated box below shows the water, slurry mass and volume, and pulp density.

12Enter the remaining measurements
Do the same for every stream in the data table. Only type what you measured. As you type, PfdLabs closes one unit after another: the crusher passes 500 t/h on, the cyclone feed follows from the underflow, the rougher tailings from the rougher…
Faster: import the survey from Excel. In the Mass balance panel click ↓ Import template: PfdLabs downloads an Excel sheet with every stream of your diagram (numbering the streams if needed). Fill in the measured values, then click ⇪ Import data and upload the file — or copy the table in Excel and paste it with Ctrl+V. PfdLabs recognises the columns from their headers and shows a preview before anything is written. Download the filled-in survey of this case study (.xlsx).
Part 3 · Read the balance
13Read the balance on the diagram
Switch the view in the top bar to Balance. Every stream shows its solids flow, % solids and assays. Values that PfdLabs calculated carry a purple calc tag; values you typed have none. A green ✓ balanced above a unit means solids, water and every metal close within 0.5 %.


Read it like a metallurgist: 500 t/h of feed at 0.80 % Cu becomes 13.9 t/h of concentrate at 26 % Cu and 9 g/t Au, and 486 t/h of tailings at 0.08 % Cu and 0.051 g/t Au.
14Check a unit
Click a unit to see its Unit balance in the properties panel: what goes in, what comes out, the difference, and for each product its mass yield, metal recovery and enrichment ratio.

15Catch a wrong value
Balances are only as good as the data. Suppose the rougher tailings were typed as 0.80 % Cu instead of 0.08. The rougher can no longer close its copper: the status turns orange and the unit shows by how much.


Fix the value and the warning disappears. A warning always tells you which unit and which component, so you know where to look.
16Circulating load
PfdLabs finds recycle streams automatically and shows the circulating load next to them, as a percentage of the plant feed. In the grinding circuit the cyclone underflow returned to the mill is 1 250 t/h for 500 t/h of new feed, a circulating load of 250 % — a typical value for a ball mill closed with hydrocyclones (usually 150–350 %). The cleaner tailings recycle adds 7 %.

17The recovery card
In the bottom-right corner of the canvas the recovery card sums up the plant: Cu recovery 90.4 % to the concentrate, its tonnage and grade, mass yield and circulating load.
Use ‹ › to switch to Au (83.4 %). The ⚙ button lets you pick the product stream (by default the richest final product) and tick Show in PNG / PDF export to print the card on exported diagrams. – minimises it to a small pill.
18The mass balance table
Open Mass balance in the top bar. The Stream table lists every stream with solids, % solids, liquid, slurry volume, pulp density and for each metal its grade, flow and recovery. Calculated values are purple. Click a row to highlight the stream on the diagram.

The Water balance tab shows the water entering and leaving the plant and the water through every unit. Here: 956 t/h in (ore moisture 15.5 t/h + process water 941 t/h) and 956 t/h out, mostly with the tailings (924 t/h).

Part 4 · Go further
19Reconcile real survey data
Real assays never close perfectly. In this survey the lab reported the final concentrate at 19.5 % Cu and we measured a few extra assays (cyclone feed and overflow, Au in the tailings). Four units now show warnings.

Open the Reconcile tab. PfdLabs adjusts every measured value as little as possible, weighted by its measurement error (5 % by default), until every unit closes — a weighted least-squares data reconciliation. The table is sorted by how much each value had to move, in units of its error (Adj./σ).

The lab re-assayed the sample: 25.6 % Cu. With the corrected value the data are consistent and the adjustments are small. Click Apply reconciled values and the balance closes everywhere.


20Visualise the metal flows
Switch the view to Sankey and choose Cu flow. Arrow widths are now proportional to the copper flow, so you see at a glance where the copper goes: the heavy recycle in grinding, the small cleaner recycle, and the thin line of copper lost to the tailings (9.7 %).

21Compare scenarios with cases
What happens with 550 t/h of a lower-grade ore? Open the Cases tab and click + Create a second case. Name it Design 2027, change the feed (S1) to 550 t/h at 0.75 % Cu and 0.28 g/t Au, and keep everything else. The Cases tab compares the key results side by side and highlights the differences.


22Size the equipment
The balance gives every unit its feed, so preliminary sizing is one step away. Click a unit and choose a method under Equipment sizing:
- Flotation — residence time: 18 min and 6 cells for the rougher give 447 m³ in total, 75 m³ per cell (with 15 % air hold-up).
- Thickener — solids flux: 0.8 t/m²/h gives 17.4 m², a 4.7 m thickener, rise rate 1.44 m/h.
- Filter — filtration rate in kg/m²/h gives the filter area.
23Reagent consumption and cost
On the rougher add PAX 25 g/t, MIBC 15 g/t and lime 600 g/t; on the cleaner PAX 5 g/t; enter prices in €/kg. The Reagents tab adds them up: consumption in kg/h, cost per hour and per tonne of ore (€ 0.26/t here).

24Report, export and share
Everything you built can leave PfdLabs:
- Report (Mass balance panel) opens a print-ready page with the diagram, key results, stream table, water balance and units — print it or save as PDF.
- Export to Excel for your own calculations.
- Export → PNG / SVG / PDF exports the diagram in the current view: Balance, Sankey, or Diagram only for a clean flowsheet.
- Share creates a read-only link: colleagues see the diagram and the balance without an account.


Now build your own plant
Open this exact flowsheet in the demo and change any tonnage or grade — or start your own diagram for free. The mass balance is included in the Pro Yearly and Lifetime plans.