Case study · mineral processing

Cu-Au concentrator: from a blank canvas to a closed mass balance

A complete worked example, step by step: we draw a copper-gold concentrator with crushing, grinding, flotation and dewatering, enter the survey data and let PfdLabs calculate the mass, water and metal balance — then reconcile real assays, size equipment and compare scenarios.

500 t/hore feed
0.80 % Cu0.30 g/t Au
90.4 %Cu recovery
83.4 %Au recovery
26 % Cuconcentrate, 9 g/t Au
250 %circulating load
Open this flowsheet in the demo →Start reading

Part 1 · Draw the flowsheet

1Plan the flowsheet

Before opening the editor, write down what you are going to draw. For this case study we model a typical copper-gold concentrator treating 500 t/h of ore:

TagUnitRole
—ROM orePlant feed, 500 t/h at 0.80 % Cu and 0.30 g/t Au
CR-101Jaw crusherPrimary crushing
ML-201Ball millGrinding, closed with cyclones
CY-201HydrocyclonesClassification: underflow back to the mill, overflow to flotation
FL-301Rougher flotationRougher concentrate to the cleaners, tailings to the dam
FL-302Cleaner flotationFinal concentrate; cleaner tailings recycled to the rougher
TH-401ThickenerConcentrate dewatering
FP-402Filter pressFilter cake = final Cu-Au concentrate

Add the process water additions (mill, cleaners) and the water leaving the plant (thickener overflow, filtrate). Water streams matter: without them the water balance cannot close.

2Create a new diagram

Sign in, open My diagrams and click + New Diagram. The editor opens with an empty canvas: the symbol library on the left, the toolbar on top and the properties panel on the right. Click the title in the top bar and rename the diagram to Cu-Au concentrator.

The empty editor: symbol library (left), toolbar (top), properties (right).
The empty editor: symbol library (left), toolbar (top), properties (right).

3Place the equipment

In the library choose the 3D style and the General area. Drag the Jaw Crusher, Ball Mill, Hydrocyclone, Flotation Cell (twice), Thickener and Filter Press onto the canvas. Use the search box (“thick…”) when you know the name. For the feed use the Ore pile, and the Tailings pond for the dam.

Dragging a symbol from the library onto the canvas.
The first three units on the canvas: ROM ore, jaw crusher and ball mill.
The first three units on the canvas: ROM ore, jaw crusher and ball mill.

Double-click a symbol to edit its label. For the concentrate use a Pill shape from Shapes, and plain Box shapes for water sources and sinks (process water, thickener overflow, filtrate). Colour them light blue in the properties panel so water is easy to recognise.

TipHold Shift and click several units to move them together. Ctrl+D duplicates the selection — handy for the second flotation bank.

4Arrange the layout

Lay out the plant in two rows: comminution on the top row from left to right, flotation and dewatering on the bottom row from right to left. This “snake” layout keeps the diagram compact and the streams short.

Turn on Snap in the bottom toolbar so units snap to the grid, and use the alignment buttons that appear when several units are selected to line up their centres. Leave about two symbol widths between units — the stream labels need the space once the balance is on.

All units placed and aligned, before any connection.
All units placed and aligned, before any connection.

5Connect the streams

Choose Connect in the toolbar. Every unit shows four connection points (north, east, south, west). Click the outlet port of one unit, then click the next unit near its inlet port: ROM ore → jaw crusher → ball mill → hydrocyclones, and so on. Go back to Select when you are done.

Connecting two units: click the outlet port, then the next unit.
Connect mode: the ports appear on every unit; the first streams of the grinding circuit are drawn.
Connect mode: the ports appear on every unit; the first streams of the grinding circuit are drawn.

Every arrow is a stream. Its direction matters: the balance treats arrows into a unit as feed and arrows out of it as products.

6Draw the recycle streams

A concentrator has recycles, and the balance finds them automatically. Draw them like any other stream, but choose the ports so the line does not cross the units:

  • Cyclone underflow (S4): from the south port of the cyclones to the south port of the ball mill.
  • Cleaner tailings (S9): from the south port of the cleaners back to the south port of the rougher.

Select the arrow and set From Port and To Port in the properties panel. The Smooth Angle style routes the line around the units with rounded corners.

The cyclone underflow S4 selected: ports South → South and the Smooth Angle route.
The cyclone underflow S4 selected: ports South → South and the Smooth Angle route.
The whole flowsheet connected: 11 process streams and 5 water streams.
The whole flowsheet connected: 11 process streams and 5 water streams.

7Add equipment tags

Click a unit and fill in Tag under Process data (CR-101, ML-201, CY-201…). Tags appear under the label in orange and are used everywhere in the balance: stream table, unit results and the Excel export.

Ball mill selected: label, size and the tag ML-201.
Ball mill selected: label, size and the tag ML-201.

8Number the streams and mark the water

Click each arrow and give it a Stream no. (1, 2, 3…). Numbers make the labels short (S1, S2…) and the tables readable. We use 1–11 for slurry and 20–24 for water.

Water streams need one more click: under Balance choose the stream type Water. Water carries no solids and no metal, so the balance treats it differently from slurry. Leave the flow empty — PfdLabs calculates it from the water balance.

Process water to the mill (S20) set as a water stream. Its flow will be calculated.
Process water to the mill (S20) set as a water stream. Its flow will be calculated.
Stream types and slurry →

Part 2 · Enter the data

9Collect the plant data

A mass balance needs measurements. In a real plant they come from the weightometer, density gauges and a sampling survey (composite samples over a shift, assayed in the lab). This is what we enter:

StreamFrom → ToSolids t/h% solidsCu %Au g/t
S1ROM ore → Jaw crusher500970.800.30
S4Cyclone underflow → Ball mill1 250750.820.31
S5Cyclone overflow → Rougher35
S6Rougher conc. → Cleaner50.7258.02.8
S7Rougher tails → Tailings dam0.08
S8Cleaner conc. → Thickener13.93026.09.0
S9Cleaner tails → Rougher201.2
S10Thickener underflow → Filter65
S11Filter cake → Concentrate91

Empty cells are not measured: PfdLabs will calculate them. Notice what is not needed — no tonnage on the crusher discharge, the cyclone feed, the tailings or the filter cake, and no water flows at all.

WhyWith the cleaner tailings recycled to the rougher, the flotation circuit has two units that feed each other. Assays alone cannot split the flows of such a loop, so we use two measured flows: the final concentrate (S8, from the concentrate weighbridge) and the rougher concentrate (S6, from a flowmeter and density gauge). Without a recycle the two-product formula would do it from assays alone.

10Add the components

Open the Mass balance panel (button in the top bar) and add the components you assay: type Cu, choose %, click + Component; then Au in g/t. Every slurry stream now has a Cu and an Au field.

The Mass balance panel with the components Cu (%) and Au (g/t).
The Mass balance panel with the components Cu (%) and Au (g/t).
TipUse Apply to all next to Solids SG if all streams have the same ore density (default 2.8). You can override it per stream.

11Enter the feed

Click stream S1 and enter 500 t/h, 97 % solids, 0.80 % Cu and 0.30 g/t Au. The stream label on the diagram updates immediately and the Calculated box below shows the water, slurry mass and volume, and pulp density.

Typing the feed data: the label and the calculated values update as you type.
Feed stream S1: entered values (black) and calculated values (purple).
Feed stream S1: entered values (black) and calculated values (purple).

12Enter the remaining measurements

Do the same for every stream in the data table. Only type what you measured. As you type, PfdLabs closes one unit after another: the crusher passes 500 t/h on, the cyclone feed follows from the underflow, the rougher tailings from the rougher…

Faster: import the survey from Excel. In the Mass balance panel click ↓ Import template: PfdLabs downloads an Excel sheet with every stream of your diagram (numbering the streams if needed). Fill in the measured values, then click ⇪ Import data and upload the file — or copy the table in Excel and paste it with Ctrl+V. PfdLabs recognises the columns from their headers and shows a preview before anything is written. Download the filled-in survey of this case study (.xlsx).

TipEmpty fields show grey hints such as “e.g. 35”. They are only examples, not values — anything you did not type stays unknown.

Part 3 · Read the balance

13Read the balance on the diagram

Switch the view in the top bar to Balance. Every stream shows its solids flow, % solids and assays. Values that PfdLabs calculated carry a purple calc tag; values you typed have none. A green ✓ balanced above a unit means solids, water and every metal close within 0.5 %.

The complete balance. All units balanced, the status in the top bar reads “Mass & metal balance: OK”.
The complete balance. All units balanced, the status in the top bar reads “Mass & metal balance: OK”.
Flotation in detail: rougher, cleaner and the recycled cleaner tailings (S9) with its circulating load.
Flotation in detail: rougher, cleaner and the recycled cleaner tailings (S9) with its circulating load.

Read it like a metallurgist: 500 t/h of feed at 0.80 % Cu becomes 13.9 t/h of concentrate at 26 % Cu and 9 g/t Au, and 486 t/h of tailings at 0.08 % Cu and 0.051 g/t Au.

14Check a unit

Click a unit to see its Unit balance in the properties panel: what goes in, what comes out, the difference, and for each product its mass yield, metal recovery and enrichment ratio.

Rougher flotation: 537 t/h in (S5 + S9) = 537 t/h out (S6 + S7). Cu recovery to the rougher concentrate 91.3 %.
Rougher flotation: 537 t/h in (S5 + S9) = 537 t/h out (S6 + S7). Cu recovery to the rougher concentrate 91.3 %.
WhyThe rougher receives 537 t/h, not 500: the recycled cleaner tailings (S9, 36.8 t/h) add to the fresh feed. That is why the unit recovery (91.3 %) is not the plant recovery.
How the balance is solved →

15Catch a wrong value

Balances are only as good as the data. Suppose the rougher tailings were typed as 0.80 % Cu instead of 0.08. The rougher can no longer close its copper: the status turns orange and the unit shows by how much.

The status in the top bar counts the warnings.
The status in the top bar counts the warnings.
The rougher flags “Cu out − in = +3.50 t/h”: more copper leaves than enters — a typo or a wrong assay.
The rougher flags “Cu out − in = +3.50 t/h”: more copper leaves than enters — a typo or a wrong assay.

Fix the value and the warning disappears. A warning always tells you which unit and which component, so you know where to look.

16Circulating load

PfdLabs finds recycle streams automatically and shows the circulating load next to them, as a percentage of the plant feed. In the grinding circuit the cyclone underflow returned to the mill is 1 250 t/h for 500 t/h of new feed, a circulating load of 250 % — a typical value for a ball mill closed with hydrocyclones (usually 150–350 %). The cleaner tailings recycle adds 7 %.

Grinding circuit: cyclone feed 1 750 t/h, underflow 1 250 t/h, circulating load 250 %.
Grinding circuit: cyclone feed 1 750 t/h, underflow 1 250 t/h, circulating load 250 %.
Circulating load explained →

17The recovery card

In the bottom-right corner of the canvas the recovery card sums up the plant: Cu recovery 90.4 % to the concentrate, its tonnage and grade, mass yield and circulating load.

Use ‹ › to switch to Au (83.4 %). The ⚙ button lets you pick the product stream (by default the richest final product) and tick Show in PNG / PDF export to print the card on exported diagrams. – minimises it to a small pill.

The recovery card.
The recovery card.
Card settings: product stream, metal, export.
Card settings: product stream, metal, export.

18The mass balance table

Open Mass balance in the top bar. The Stream table lists every stream with solids, % solids, liquid, slurry volume, pulp density and for each metal its grade, flow and recovery. Calculated values are purple. Click a row to highlight the stream on the diagram.

Stream table of the whole plant. Flows per hour, day or year from the “Flows per” selector.
Stream table of the whole plant. Flows per hour, day or year from the “Flows per” selector.

The Water balance tab shows the water entering and leaving the plant and the water through every unit. Here: 956 t/h in (ore moisture 15.5 t/h + process water 941 t/h) and 956 t/h out, mostly with the tailings (924 t/h).

Water balance: plant boundary and every unit.
Water balance: plant boundary and every unit.
TipExport to Excel writes the stream table, the water balance, the unit results and the key results into one workbook, ready for a report.

Part 4 · Go further

19Reconcile real survey data

Real assays never close perfectly. In this survey the lab reported the final concentrate at 19.5 % Cu and we measured a few extra assays (cyclone feed and overflow, Au in the tailings). Four units now show warnings.

Raw survey data: Cu and Au imbalances on four units.
Raw survey data: Cu and Au imbalances on four units.

Open the Reconcile tab. PfdLabs adjusts every measured value as little as possible, weighted by its measurement error (5 % by default), until every unit closes — a weighted least-squares data reconciliation. The table is sorted by how much each value had to move, in units of its error (Adj./σ).

The concentrate assay S8 needs +12 %, 2.4 σ: flagged in orange as a likely gross error. The χ² test confirms the data set is inconsistent.
The concentrate assay S8 needs +12 %, 2.4 σ: flagged in orange as a likely gross error. The χ² test confirms the data set is inconsistent.

The lab re-assayed the sample: 25.6 % Cu. With the corrected value the data are consistent and the adjustments are small. Click Apply reconciled values and the balance closes everywhere.

Corrected data: “Measurements are consistent”, all adjustments within one σ.
Corrected data: “Measurements are consistent”, all adjustments within one σ.
After applying the reconciled values every unit is balanced.
After applying the reconciled values every unit is balanced.
Data reconciliation →

20Visualise the metal flows

Switch the view to Sankey and choose Cu flow. Arrow widths are now proportional to the copper flow, so you see at a glance where the copper goes: the heavy recycle in grinding, the small cleaner recycle, and the thin line of copper lost to the tailings (9.7 %).

Sankey view of the copper flow. Labels show t/h of Cu and % of the feed.
Sankey view of the copper flow. Labels show t/h of Cu and % of the feed.

21Compare scenarios with cases

What happens with 550 t/h of a lower-grade ore? Open the Cases tab and click + Create a second case. Name it Design 2027, change the feed (S1) to 550 t/h at 0.75 % Cu and 0.28 g/t Au, and keep everything else. The Cases tab compares the key results side by side and highlights the differences.

Switch between cases in the top bar.
Switch between cases in the top bar.
Base case vs. Design 2027: concentrate, recoveries, tailings and water at a glance.
Base case vs. Design 2027: concentrate, recoveries, tailings and water at a glance.

22Size the equipment

The balance gives every unit its feed, so preliminary sizing is one step away. Click a unit and choose a method under Equipment sizing:

  • Flotation — residence time: 18 min and 6 cells for the rougher give 447 m³ in total, 75 m³ per cell (with 15 % air hold-up).
  • Thickener — solids flux: 0.8 t/m²/h gives 17.4 m², a 4.7 m thickener, rise rate 1.44 m/h.
  • Filter — filtration rate in kg/m²/h gives the filter area.
Rougher flotation: residence-time sizing.
Rougher flotation: residence-time sizing.
Thickener: solids-flux sizing.
Thickener: solids-flux sizing.
Equipment sizing →

23Reagent consumption and cost

On the rougher add PAX 25 g/t, MIBC 15 g/t and lime 600 g/t; on the cleaner PAX 5 g/t; enter prices in €/kg. The Reagents tab adds them up: consumption in kg/h, cost per hour and per tonne of ore (€ 0.26/t here).

Reagents per unit and plant totals.
Reagents per unit and plant totals.

24Report, export and share

Everything you built can leave PfdLabs:

  • Report (Mass balance panel) opens a print-ready page with the diagram, key results, stream table, water balance and units — print it or save as PDF.
  • Export to Excel for your own calculations.
  • Export → PNG / SVG / PDF exports the diagram in the current view: Balance, Sankey, or Diagram only for a clean flowsheet.
  • Share creates a read-only link: colleagues see the diagram and the balance without an account.
PNG export in the Balance view, with the recovery card.
PNG export in the Balance view, with the recovery card.
The balance report, ready to print or save as PDF.
The balance report, ready to print or save as PDF.

Now build your own plant